By pressing the red button Dutch minister Melanie Schultz van Haegen officially started the construction of a new sea lock at IJmuiden, the Netherlands.

The lock chamber will be 70 meters wide, 500 meters long and 18 meters deep, giving excess to the port of Amsterdam to larger sea vessels. By 2019 when it is scheduled to be ready.

The sea lock at IJmuiden will become the biggest sea lock in the world as it will be 2 m wider than the world's current biggest lock, the Kieldrecht lock in Antwerpen, Belgium.

The responsibility for the construction, as well as 26-year maintenance of the sea lock, is in the hands of consortium OpenIJ, including construction firms BAM and Volker-Wessels and financers PGGM (pension fund) and DIF (investor). The whole project has been budgeted for 815 million euro.

The groundbreaking event took place on 7 September.

dws-rws-lock-ijmuiden-projection-350px  Projection (in blue) of the new lock at IJmuiden in between the existing ones.

Inventive engineering
On occasion of the groundbreaking event minister Schultz said: "This mega project is a wonderful example of inventive engineering. The new lock is built on a very small area between the other locks that will remain open all the time."

"The new lock ensures better accessibility", the minister continued, "to the Port of Amsterdam so it can maintain its position in Europe and possibly become the third largest port in Europe. "

Construction of rolling gates
The lock will have 80 x 55 m roller gates that roll aside as the lock opens. The concrete housing of these gates will be constructed above ground level and then sunk.

This avoids a deep excavation, preventing noise nuisance to the environment and risks to the existing locks.

Only one spare door
Another innovative feature is the similar design of the outside (sea) and the inside (land) lock doors.

This allows that only three lock doors - one spare - need to be constructed. Normally sea locks have a higher door on the outside gate and two spare doors are constructed.

dws-rws-lock-ijmuiden-model-350pxScale model of the sea lock at the experimental facilities of Deltares in Delft, the Netherlands.

Scale model for validation
Research institute Deltares has used a 1:40 scale model to simulate the operation of the lock to be able to study the fresh and salt water flows.

In detail Deltares also used the scale model to study the required levelling time and the forces exerted on the ships in the chamber during levelling.

The results of the scale tests were used to validate the numerical models used to design the lock.

Monitoring movement mechanism
During the construction of the new lock, engineering firm Iv-Infra will monitor the movement mechanism, joint movement mechanism, vibrations, groundwater and excessive water pressure.

Iv-Group has previous experiences in roller gates. As a sub-contractor the firm has been involved in the expansion of the Panama canal, being responsible for designing the rolling lock doors and the transmission mechanism.

This news item is based on original publications on the websites of Rijkswaterstaat and Volker Wessels (both in Dutch only)

Read also on this website
Rijkswaterstaat announces intention to award construction new sea lock at IJmuiden, the Netherlands, 20 July 2015
Belgian and Dutch ministers agree on 920 million euro sea lock at Terneuzen, the Netherlands, 6 February 2015

More information
Royal BAM Group
Bunnik, the Netherlands
+31 30 659 8988
www.bam.com/en

VolkerWessels
Amersfoort, the Netherlands
+31 88 186 6186
www.volkerwessels.com

Deltares
Delft, the Netherlands
+31 88 335 8273
www.deltares.nl

Iv Group
Papendrecht, the Netherlands
+31 78 644 80 00
www.iv-groep.nl/en